INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION CLAD HINGED PATIO DOOR — (INCLUDES STANDARD, PERFORMANCE UPGRADE AND HURRICANESHIELD® IMPACT
4INTEGRATING THE DOOR TO THE WATER RESISTIVE BARRIERA. Apply side ashing tape. Cut two pieces of ashing tape 4" longer than the frame height
5INSTALL THE FASTENERS FOR PERFORMANCE UPGRADE OR HURRICANESHIELD PRODUCTFrame Screw Method:Note: If installing with installation clips, proceed to S
5FEXTERIORINTERIORDrill 1/8” diameter pilotholes through the clearancehole in the frame.5COut-Swing#10 x 3-1/2" corrosion resistant wood screw5DE
6INTERIOR SEALA. Apply insulating foam sealant. From the interior, insert the nozzle of the applicator into the space between the door and the rough
7SEALING THE DOOR TO THE EXTERIOR WALL CLADDINGWhen applying siding, brick veneer or other exterior nish material, leave adequate space between the
INTERIOR FINISHINGIf products cannot be nished immediately, cover with clear plastic to protect from dirt, damage and moisture. Remove any constructi
TROUBLESHOOTING - Adjustable Strike Latching IssuesTABSAdjustable strike shim(side view)Strike(front view)Adj. Strike Shim(end view)Factory installed
e performance of any building is dependent upon the design, installation, and workmanship of the entire building system. Pella Corporation strongly
FOR DOORS USING OPTIONAL SILL PAN GO TO STEP 1I. Exterior1D4th cut: Make a 6" cut up from each top corner at a 45o angle to allow the water resis
Optional Sill Pan Instructions:I. Cut the sill pan to the width of the rough opening plus 2”.Note: e 2” added onto the rough opening width is for a
2 PREPARE THE DOOR FOR INSTALLATIONTWO OR MORE PEOPLE WILL BE REQUIRED TO HANDLE THE PANEL AND FRAME SAFELY.A. Remove plastic wrap and cardboard pack
Applications for Performance Upgrade and HurricaneShield: 6" 16" MAX O.C. 16" MAX O.C. 16" MAX O.C. 16" MAX O.C. 6"
TWO OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS:B. Cut and remove the strap that runs from the door lock to the sill of the door.C. Insert
F. Fasten the door to opening by driving 2” galvanized roong nails into each pre-punched hole in the nailing n.Note: Make sure the n corner is lyi
K. Shim between the frame and the rough opening at the head strike location and at every frame anchor hole location. Remove and replace head strike
Commentaires sur ces manuels